Skip to content

Bringing you stories that vibe with your fashion

Latest News

Over 10 Lima, Callao Districts to Lose Power Aug. 5-7

Pluz Energía will cut power to more than 10 districts of Lima and Callao for up to 12 hours between August 5 and 7 for grid maintenance.

Over 10 Lima, Callao Districts to Lose Power Aug. 5-7

Pluz Energía has scheduled new power outages across Lima and Callao from Wednesday, August 5, to Friday, August 7, 2026, the company said. The cuts are for maintenance and intervention work on the electrical grid and will reach areas of San Juan de Lurigancho, Puente Piedra, Bellavista, Carabayllo and Rímac.

Outage times vary by sector and will last from a few hours up to about eight hours in some cases. Pluz asked customers to check the schedule for their sector and take the necessary precautions.

Se recomienda a la población a tomar medidas preventivas durante las interrupciones del servicio eléctrico en Lima y Callao.



Pluz advised residents to take preventive measures during the interruptions to electrical service in Lima and Callao.

Outages on Wednesday, August 5

  • Lima Cercado (12 a.m.-6 a.m.): Abancay Avenue (blocks 7 and 8), Nicolás de Piérola Avenue (blocks 14 and 15), Ayacucho Street (block 8), Inambari Street (block 7), Santa Catalina Street (block 6) and Puno Street (blocks 4, 5 and 6).
  • Callao (8 a.m.-6 p.m.): Las Azucenas, Los Geranios, Las Margaritas, Las Rosas, Los Lirios, Los Gladiolos and Los Tulipanes streets, plus 2nd Street, A Street, Corpac Avenue and the Faucett auxiliary road.
  • San Martín de Porres (8:30 a.m.-6:30 p.m.): the California housing development and the Brisas de Santa Rosa, Virgen del Carmen, Los Portales de Santa Rita, Las Casuarinas de Santa Rosa and Los Robles de Santa Rosa associations.
  • Rímac (8 a.m.-7 p.m.): the Municipal No. 3 Committee 13 settlement and the Flor de Amancaes sector.
  • Los Olivos (7 a.m.-7 p.m.): the entire Pro Lima housing development.
  • San Juan de Lurigancho (9:30 a.m.-5:30 p.m.): the Jorge Basadre Association, the Mariscal Andrés Avelino Cáceres settlement, the La Huayrona, San Carlos and San Gabriel developments, Jorge Basadre Este Avenue (block 6), Santa Rosa Avenue (block 23) and Los Asbestos Street (block 6).
  • Huaura (8 a.m.-1 p.m.): the San Juan Bautista settlement.

Outages on Thursday, August 6

  • Puente Piedra (8:30 a.m.-6:30 p.m.): the Luis Pardo Novoa Municipal Association, the San Diego II Etapa housing program, and the Las Hortalizas, Villa Margarita, Las Tres Regiones, El Platanal, Los Huertos de Puente Piedra, Villa Florida, Los Sauces, Villa Las Flores, Los Manantiales, Gallinazos, Uno de Mayo and Santa Inés associations.
  • San Juan de Lurigancho (9:30 a.m.-5:30 p.m.): the Compradores de Terrenos de Campoy Association, Los Próceres Avenue (blocks 15 and 16) and Las Flores de Primavera Avenue (block 9).

Outages on Friday, August 7

  • Callao (8 a.m.-6 p.m.): Ayacucho Street (block 12), Miroquesada Street (block 13), República de Panamá Avenue, Sáenz Peña Avenue, Montezuma Street, La Paz Avenue, Lazareto Street, César Vallejo Street, Manuel Raygada Street, Nueva Street and Tacna Street.
  • Puente Piedra (9 a.m.-6 p.m.): the Lomas de Puente Piedra, Gramadales and Las Gardenias associations and the Los Andes del Perú settlement.
  • Carabayllo (9:30 a.m.-6 p.m.): the Los Suyos-El Reposo housing program and the Los Suyos Association.
  • Comas (9 a.m.-3 p.m.): the Alameda del Retablo development, buildings E through M.
  • San Martín de Porres (12 a.m.-4 p.m.): Alfredo Mendiola Avenue (blocks 11 and 12).
  • Independencia (8 a.m.-6 p.m.): Las Amapolas Street, Las Gladiolas Avenue, Las Violetas Avenue, Los Pinos Avenue, Los Robles Avenue, Los Claveles Street and Los Nogales Street.
  • San Juan de Lurigancho (9 a.m.-6 p.m.): San Francisco Street (blocks 7 and 8) and Las Mercedes Street (blocks 9 and 10).
  • Magdalena del Mar (8:30 a.m.-6:30 p.m.): Brasil Avenue, del Ejército Avenue, Augusto Pérez Araníbar Avenue, Pedro Drinot Street (Arica), the Larco Herrera, Sáenz Peña, Sucre, Hermilio Valdizán, Moore, Raimondi, García Salcedo, Ildefonso Fuentes, Eduardo Carrasco and Francisco Bejarano streets, plus Malecón Grau and the Costa Verde beach circuit.
  • Rímac (9 a.m.-6 p.m.): A Avenue, Praderas 4 (buildings 2 and 3).

How to download a copy of your bill

Pluz customers can download a copy of their bill through the company's Client Portal or its mobile app. To receive it monthly by email, they must activate the Digital Receipt option and log in with their account. From the app, customers only need to register their supply number, go to My Billing, select View Receipt and download the document. A physical copy is issued only at service centers when it is needed for an official procedure.

Where to find your client number

The client number identifies the electrical service user and is often requested for inquiries or procedures. It appears on the right side of the bill, inside a highlighted box. It can also be checked through the company's mobile app or on its website, in the section explaining how to read the electricity bill.

Related

Leave a comment

Your email address will not be published. Required fields are marked *